Monday, July 23, 2012

Day 1 at the DRV Plant.

Up at 5:00 a.m. and out of the RV by 6:00 so the work can begin.  That is just way to early for my blood.  Fred wasn’t liking it either. Our list of items is a small one this time.  After meeting with the tech (the worker assigned to resolve items on our list) we were told it would probably be Tuesday before everything was completed.
DSCN8946
Our sink was detaching again so it was on the list.  We were pleasantly surprised to see a brand new sink installed today.
DSCN8949
The faucet in the shower was holding water so they replaced that and …..
DSCN8951
The mirror over the dresser that was cracked was also replaced. 
There were a few other small items that were also replaced.  All in all it was a productive day.  Hopefully, the remaining items will be completed tomorrow and we can be on our way to meet up with our friends.
Laugh everyday.  Happy trails.  Stay safe.

4 comments:

  1. Going to the factory to get repairs is the only way to go.

    ReplyDelete
  2. We also had our sink come loose. Getting a new sink was a plus! Sooner or later we may replace the shower handles with a one handle faucet. For now I just drilled a couple of small holes in the bottom of the handles to let the water drain out.

    ReplyDelete
  3. Sounds like things are going smoothly....I love it when a plan actually comes together.

    ReplyDelete
  4. Hope you manage to get everything sorted out!

    Poor old Fred waking early, he looks a lovely dog.

    Sft x

    ReplyDelete