Up at 6, worked 7-3 at the mall, Apple is opening a store on Saturday so we continued cleanup. Lunch at Bridget's office, sandwiches and chips. Got back at 1pm with the portable radio blaring that the sewer was backed up in building 9000, the entire building, all the stores. Plumber showed up within 20 minutes and snaked the sewer line clean. No damage to the stores, each bathroom has floor drains.
Got home after the PO, was about 3:30. Started on the surge protector when I remembered to hook up the drain on the dishwasher, done. Back on the surge protector, installed it in the electrical bay, no problems other then having to go to Lowes for 6/3 w ground, less than a foot needed. Will check for leaks and power at Tunica next week.
Going to read blogs.
Stay Safe
Sounds like you have been busy!! Let us know how they all work...Netters
ReplyDelete